+49 89 1241386-70 

Projects

Since 2012, sommer + spohr have successfully implemented over 60 projects for media houses, system integrators and manufacturers.

Seminar Requirement Analysis

Seminar Requirement Analysis

ard.zdf Medienakademie | Seminar requirement analysis | Nuremberg, 2016 - today | For many years, we have been dealing with the subject of requirements management in a wide range of projects. We have learned that good ...
more ...
Solution concept for News Management System

Solution concept for News Management System

ARD-aktuell | Concept of newsroom management system | Hamburg, 2017 - 2018 | As part of the multimedia reorientation of ARD-aktuell, the organizational changes should also be optimally supported by a new software ...
more ...
Concept for trimedial programm and planning system

Concept for trimedial programm and planning system

Concept for trimedial programm and planning system | Südwestrundfunk | Baden-Baden, 2018 | At the end of the life cycle, the existing programm and planning system for television needs to be replaced. Along with the ...
more ...
Requirement analysis for shared production

Requirement analysis for shared production

Norddeutscher Rundfunk | Requirement analysis VPN3 | Hamburg, 2017 | The customer was faced with the challenge of changing the decentralized video production throughout the entire house. For this, a viable concept...
more ...
Control room of the future at Deutschlandradio

Control room of the future at Deutschlandradio

Deutschlandradio | Conception of the new processes in Schaltraum der Zukunft | Berlin / Cologne, 2018 - 2019 | Along with the introduction of a new switch room software for the two locations ...
more ...
Introducing a trimedial program and transmission planning system

Introducing a trimedial program and transmission planning system

Schweizer Radio und Fernsehen SRF | Requirement analysis, project lead | Zurich, 2017 - 2018 | The customer was faced with the challenge of integrating program and broadcast planning for TV, radio and online ...
more ...
Trimedial newsroom system at BR

Trimedial newsroom system at BR

Bayerischer Rundfunk | Project Lead | Munich, 2015 - 2017 | Within the framework of the BR trimedial strategy, television, radio and online collaboration should be fundamentally improved. In addition, it was necessary to ...
more ...
Introduction of a new traffic editors system

Introduction of a new traffic editors system

Bayerischer Rundfunk| Project Lead | Munich, 2016 - 2018 | With the nationwide planned conversion of the TMC standard to TPEG, it was necessary in the course of sustainability for the BR...
more ...
Requirement for a programming system

Requirement for a programming system

Südwestrundfunk | Consulting | Baden-Baden, 2018 – 2019 |Replacing a programming system is a complex project. Both the technical and the organizational ...
more ...
Recording of requirements for the renewal of post production at SWR

Recording of requirements for the renewal of post production at SWR

SWR is about to change the systems in its post-production. For the optimal alignment of the new solution, the requirements of all stakeholders must be known. sommer + spohr moderated ...
more ...
Shoulder look at the lunch time magazine

Shoulder look at the lunch time magazine

  The crunch time of the ARD Mittagsmagazin, which is produced every fortnight in Berlin, is the hot phase shortly before and during the live broadcast. It is strongly characterised by spatial ...
more ...
Introduction of a tailor-made project approach at the ARD broadcasting center based on SCRUM

Introduction of a tailor-made project approach at the ARD broadcasting center based on SCRUM

The ARD broadcasting centre was faced with the challenge of automatically transporting incoming material to the respective ARD media library in order to be able to publish it there. The ...
more ...